Inspection Reports for Friedwald Center for Rehabilitation and Nursing
NY, 10956
Back to Facility ProfileDeficiencies (last 2 years)
Deficiencies (over 2 years)
11.5 deficiencies/year
Deficiencies are regulatory violations found during state inspections.
125% worse than New York average
New York average: 5.1 deficiencies/yearDeficiencies per year
20
15
10
5
0
Inspection Report
Complaint Investigation
Capacity: 60
Deficiencies: 3
Date: Aug 23, 2024
Visit Reason
Complaint Survey with 3 Standard Health citations related to care plan timing, abuse reporting, and staff competency; all Level 2 severity and corrected by September 30, 2024.
Findings
Complaint Survey with 3 Standard Health citations related to care plan timing, abuse reporting, and staff competency; all Level 2 severity and corrected by September 30, 2024.
Deficiencies (3)
Care plan timing and revision
Free from abuse and neglect
Sufficient/competent staff-behav health needs
Inspection Report
Complaint Investigation
Capacity: 60
Deficiencies: 19
Date: Jul 16, 2024
Visit Reason
Complaint Survey with 11 Standard Health citations and 8 Life Safety Code citations; deficiencies included care planning, grievances, infection control, medication labeling, quality of care, and multiple life safety issues; mostly Level 2 severity and corrected by early September 2024.
Findings
Complaint Survey with 11 Standard Health citations and 8 Life Safety Code citations; deficiencies included care planning, grievances, infection control, medication labeling, quality of care, and multiple life safety issues; mostly Level 2 severity and corrected by early September 2024.
Deficiencies (19)
Develop/implement comprehensive care plan
Grievances
Increase/prevent decrease in rom/mobility
Infection prevention & control
Investigate/prevent/correct alleged violation
Label/store drugs and biologicals
Nurse aide peform review-12 hr/yr in-service
Quality of care
Reporting of alleged violations
Right to refuse certain transfers
Safe/clean/comfortable/homelike environment
Building construction type and height
Corridor - doors
Discharge from exits
Policies for evac. And primary/alt. Comm.
Portable fire extinguishers
Sprinkler system - maintenance and testing
Standards of construction for new existing nh
Subdivision of building spaces - smoke barrie
Inspection Report
Complaint Investigation
Capacity: 60
Deficiencies: 1
Date: Nov 20, 2023
Visit Reason
Covid-19 Survey with 1 Standard Health citation related to reporting to national health safety network; Level 2 severity and widespread scope; no correction date noted.
Findings
Covid-19 Survey with 1 Standard Health citation related to reporting to national health safety network; Level 2 severity and widespread scope; no correction date noted.
Deficiencies (1)
Reporting - national health safety network
Loading inspection reports...



