Inspection Reports for Harlem Center for Nursing and Rehabilitation
30 West 138th Street, NY, 10037
Back to Facility ProfileDeficiencies (last 3 years)
Deficiencies (over 3 years)
7 deficiencies/year
Deficiencies are regulatory violations found during state inspections.
37% worse than New York average
New York average: 5.1 deficiencies/yearDeficiencies per year
20
15
10
5
0
Inspection Report
Complaint Investigation
Capacity: 60
Deficiencies: 1
Apr 3, 2025
Visit Reason
Inspection found immediate jeopardy related to accident hazards and substandard quality of care; deficiency was corrected by March 24, 2025.
Findings
Inspection found immediate jeopardy related to accident hazards and substandard quality of care; deficiency was corrected by March 24, 2025.
Deficiencies (1)
| Description | Severity |
|---|---|
| Free of accident hazards/supervision/devices | Level 4 |
Inspection Report
Complaint Investigation
Capacity: 60
Deficiencies: 18
Feb 12, 2025
Visit Reason
Multiple standard health and life safety code deficiencies were identified, mostly level 2 severity, including infection control, mobility, staffing information, and building safety features; all corrected by April 2025.
Findings
Multiple standard health and life safety code deficiencies were identified, mostly level 2 severity, including infection control, mobility, staffing information, and building safety features; all corrected by April 2025.
Deficiencies (18)
| Description | Severity |
|---|---|
| Dispose garbage and refuse properly | Level 2 |
| Increase/prevent decrease in rom/mobility | Level 2 |
| Infection prevention & control | Level 2 |
| Posted nurse staffing information | Level 1 |
| Qaa committee | Level 2 |
| Resident records - identifiable information | Level 2 |
| Services provided meet professional standards | Level 2 |
| Treatment/svcs to prevent/heal pressure ulcer | Level 2 |
| Corridor - doors | Level 2 |
| Corridors - construction of walls | Level 2 |
| Electrical equipment - power cords and extens | Level 2 |
| Electrical systems - maintenance and testing | Level 2 |
| Electrical systems - other | Level 2 |
| Fire drills | Level 2 |
| Fundamentals - building system categories | Level 2 |
| Sprinkler system - installation | Level 2 |
| Sprinkler system - maintenance and testing | Level 2 |
| Subdivision of building spaces - smoke barrie | Level 2 |
Inspection Report
Capacity: 60
Deficiencies: 1
Jan 30, 2024
Visit Reason
Covid-19 survey identified a level 2 deficiency in reporting to the national health safety network, widespread in scope and not corrected at time of report.
Findings
Covid-19 survey identified a level 2 deficiency in reporting to the national health safety network, widespread in scope and not corrected at time of report.
Deficiencies (1)
| Description | Severity |
|---|---|
| Reporting - national health safety network | Level 2 |
Inspection Report
Capacity: 60
Deficiencies: 1
Dec 19, 2022
Visit Reason
Covid-19 survey identified a level 2 deficiency in reporting to the national health safety network, widespread in scope and not corrected at time of report.
Findings
Covid-19 survey identified a level 2 deficiency in reporting to the national health safety network, widespread in scope and not corrected at time of report.
Deficiencies (1)
| Description | Severity |
|---|---|
| Reporting - national health safety network | Level 2 |
Loading inspection reports...



