Inspection Reports for Meadow Park Rehabilitation and Health Care Center LLC

78-10 164th Street, Flushing, NY, 11366

Back to Facility Profile

Inspection Report Summary

The most recent inspection on July 7, 2025, identified deficiencies related to care plan timing, abuse prevention, investigation, and reporting of alleged violations, all of which were corrected by July 25, 2025. Earlier inspections showed a pattern of deficiencies involving care plan development, infection control, food sanitation, electrical and fire safety systems, and building maintenance, with all cited issues addressed within a few months. Inspectors noted recurring themes around care planning and safety systems, as well as compliance with abuse prevention and reporting requirements. Complaint investigations were unsubstantiated aside from these cited deficiencies, and no fines, immediate jeopardy findings, or license actions were listed in the available reports. The facility appears to have maintained a pattern of identifying and correcting issues promptly over time.

Deficiencies (last 3 years)

Deficiencies (over 3 years) 7.3 deficiencies/year

Deficiencies are regulatory violations found during state inspections.

43% worse than New York average
New York average: 5.1 deficiencies/year

Deficiencies per year

12 9 6 3 0
2022
2024
2025

Inspection Report

Complaint Investigation
Capacity: 60 Deficiencies: 4 Date: Jul 7, 2025

Visit Reason
Complaint Survey with 4 Standard Health citations related to care plan timing, abuse prevention, investigation and reporting of alleged violations, all corrected by July 25, 2025.

Findings
Complaint Survey with 4 Standard Health citations related to care plan timing, abuse prevention, investigation and reporting of alleged violations, all corrected by July 25, 2025.

Deficiencies (4)
Care plan timing and revision
Free from abuse and neglect
Investigate/prevent/correct alleged violation
Reporting of alleged violations

Inspection Report

Complaint Investigation
Capacity: 60 Deficiencies: 11 Date: Apr 2, 2024

Visit Reason
Complaint Survey with 5 Standard Health citations and 6 Life Safety Code citations including deficiencies in care plan development, food sanitation, infection control, drug labeling, electrical equipment, fire alarm testing, physical environment, and sprinkler system maintenance, all corrected by May 2024.

Findings
Complaint Survey with 5 Standard Health citations and 6 Life Safety Code citations including deficiencies in care plan development, food sanitation, infection control, drug labeling, electrical equipment, fire alarm testing, physical environment, and sprinkler system maintenance, all corrected by May 2024.

Deficiencies (11)
Develop/implement comprehensive care plan
Food procurement,store/prepare/serve-sanitary
Infection control
Label/store drugs and biologicals
Reporting of alleged violations
Electrical equipment - power cords and extens
Electrical systems - essential electric syste
Ep training and testing
Fire alarm system - testing and maintenance
Physical environment
Sprinkler system - maintenance and testing

Inspection Report

Complaint Investigation
Capacity: 60 Deficiencies: 1 Date: Jan 9, 2024

Visit Reason
Complaint Survey with 1 Standard Health citation related to requirements before submitting a request, corrected by February 5, 2024.

Findings
Complaint Survey with 1 Standard Health citation related to requirements before submitting a request, corrected by February 5, 2024.

Deficiencies (1)
Requirements before submitting a request for

Inspection Report

Complaint Investigation
Capacity: 60 Deficiencies: 6 Date: Apr 8, 2022

Visit Reason
Complaint Survey with 6 Life Safety Code citations including building construction, egress doors, electrical systems, hazardous areas enclosure, sprinkler system maintenance, and smoke barrier subdivision, all corrected by June 2022.

Findings
Complaint Survey with 6 Life Safety Code citations including building construction, egress doors, electrical systems, hazardous areas enclosure, sprinkler system maintenance, and smoke barrier subdivision, all corrected by June 2022.

Deficiencies (6)
Building construction type and height
Egress doors
Electrical systems - essential electric syste
Hazardous areas - enclosure
Sprinkler system - maintenance and testing
Subdivision of building spaces - smoke barrie

Loading inspection reports...