Inspection Reports for Rest Haven Homes

1424 Union Ave NE, Grand Rapids, MI 49505, United States, MI, 49505

Back to Facility Profile

Deficiencies (last 4 years)

Deficiencies (over 4 years) 0.8 deficiencies/year

Deficiencies are regulatory violations found during state inspections.

85% better than Michigan average
Michigan average: 5.2 deficiencies/year

Deficiencies per year

4 3 2 1 0
2013
2022
2023
2024
Inspection Report Renewal Census: 35 Capacity: 110 Deficiencies: 3 Sep 4, 2024
Visit Reason
The inspection was conducted as a renewal licensing study for Rest Haven Home to assess compliance with applicable rules and regulations.
Findings
The facility was found to be in non-compliance with several rules including failure to complete an annual tuberculosis risk assessment, lack of clarity in resident medication management plans, and inadequate protection of food items in the kitchen refrigerator.
Deficiencies (3)
Description
Annual tuberculosis risk assessment was not completed, so the facility's TB risk level was not determined.
Resident service plans did not identify whether medications were self-administered or managed by the home, leaving responsibility unclear.
Two carts of dessert items in the walk-in refrigerator were not covered or protected against contamination; several items in the reach-in refrigerator were not labeled or dated.
Report Facts
Number of staff interviewed and/or observed: 10 Number of residents interviewed and/or observed: 35 Facility capacity: 110
Inspection Report Renewal Deficiencies: 0 Aug 22, 2023
Visit Reason
The document serves as a renewal notification for the Home for the Aged license following an administrative review of licensing activity over the past year.
Findings
The review revealed substantial compliance with the public health code and administrative rules regulating home for the aged facilities, resulting in the renewal of the facility's 12-month regular license effective August 22, 2023.
Report Facts
License effective period: 12
Employees Mentioned
NameTitleContext
Lauren WohlfertLicensing StaffSigned the renewal notification letter
Inspection Report Original Licensing Capacity: 110 Deficiencies: 0 Dec 22, 2022
Visit Reason
The purpose of the visit was to document the completion of phase II construction in the east wing of the facility and to verify that the licensed bed capacity remains at 110.
Findings
Phase II construction of the newly completed east wing is finished, including 15 resident rooms, dining room, satellite kitchen, enclosed courtyard, and activity lounge. The facility received full fire safety and occupancy approvals, and occupancy approval for the new wing is recommended.
Report Facts
Licensed bed capacity: 110 Resident rooms in new wing: 15 Date of fire safety approval: 12/15/22 (date of Bureau of Fire Services approval) Date of occupancy approval: 12/19/22 (date of Health Facilities Engineering approval)
Employees Mentioned
NameTitleContext
Lauren WohlfertLicensing StaffCompleted the onsite inspection and signed the report
Gregory TracyAuthorized RepresentativeNamed as licensee designee and recipient of the report
Inspection Report Original Licensing Capacity: 110 Deficiencies: 0 Mar 2, 2022
Visit Reason
The inspection visit was conducted to document and verify the increased licensed bed capacity following completion of phase I of the east wing construction, which added 20 resident rooms and 24 beds.
Findings
The newly constructed east wing, named the 'love wing,' includes 20 resident rooms with a mix of single and double occupancy, secured access, and resident amenities. The facility received fire safety and occupancy approvals, and phase I construction is complete while phase II remains in progress.
Report Facts
Licensed bed capacity increase: 110 Resident rooms added: 20 Single occupancy rooms: 16 Double occupancy rooms: 4 Date of onsite inspection: Mar 2, 2022 Date of fire safety approval: Mar 15, 2022 Date of occupancy approval: Mar 15, 2022
Employees Mentioned
NameTitleContext
Gregory TracyAuthorized Representative/AdministratorNamed as facility administrator
Lauren WohlfertLicensing StaffConducted inspection and authored report
Andrea L. MooreManager, Long-Term-Care State Licensing SectionApproved the licensing study addendum
Inspection Report Original Licensing Capacity: 86 Deficiencies: 0 Aug 9, 2013
Visit Reason
The licensee submitted an application requesting an increase in licensed bed capacity by adding two distinct areas connected to the home for the aged building.
Findings
The inspection included a review of facility floor plans, fire safety certifications, and an onsite inspection of the entire facility including the Hope Wing, Love Wing, and Love Wing Extended. The facility was found compliant with fire safety and disaster plans, and the licensed bed capacity increase to 86 was recommended.
Report Facts
Licensed bed capacity: 86 Square footage: 2602 Date of onsite inspection: Aug 9, 2013
Employees Mentioned
NameTitleContext
Russell B. MisiakLicensing StaffConducted the inspection and authored the report
Betsy MontgomeryArea ManagerApproved the licensing bed capacity increase
Terry CarrickAdministrator/Authorized Representative of the facility