Inspection Reports for
Julinda‘s Care Home

CA, 92335

Back to Facility Profile

6 Reports

2021–2025

Inspection Report — Nov 4, 2025

Annual Inspection
Date: Nov 4, 2025

Visit Reason
The visit was an unannounced required comprehensive annual inspection of the Residential Care Facility for Elderly (RCFE) to assess compliance with licensing requirements.

Findings
The facility was found to be operating within approved capacity and in safe, clean, and good repair conditions. No deficiencies were cited during the inspection, and all reviewed resident and staff files were in order with appropriate certifications and clearances.

Report Facts
Water temperature: 109

Employees mentioned
NameTitleContext
Benyamin LumintaintamgFacility CaregiverMet during inspection and named in exit interview
Paola GuerreroLicensing Program AnalystConducted the inspection
Efren MalagonLicensing Program ManagerNamed as Licensing Program Manager on report

Inspection Report — Sep 30, 2025

Complaint Investigation
Date: Sep 30, 2025

Visit Reason
The visit was an unannounced complaint investigation conducted in response to allegations received on 2025-09-23 regarding unlawful eviction, mistreatment of residents, and non-compliance with the admission agreement at Julinda's Home Care Facility.

Complaint Details
The complaint investigation was unsubstantiated. Allegations included unlawful eviction of residents, mistreatment by staff, and non-compliance with the admission agreement. Interviews with the resident and staff denied these allegations, and record reviews supported these findings.
Findings
The investigation found all allegations to be unsubstantiated after interviews, record reviews, and observations. The facility had one resident at the time of inspection, and no evidence supported claims of unlawful eviction, mistreatment, or failure to abide by the admission agreement.

Report Facts

Employees mentioned
NameTitleContext
Paola GuerreroLicensing Program AnalystConducted the complaint investigation and interviews
Julinda RodriguezFacility AdministratorMet with Licensing Program Analyst during the investigation and provided information

Inspection Report — Nov 5, 2024

Annual Inspection
Date: Nov 5, 2024

Visit Reason
The visit was an unannounced required comprehensive annual inspection of the facility.

Findings
The facility was found to be operating within the approved capacity and in safe, clean, and good repair conditions with no deficiencies cited. All required safety equipment and postings were present, and staff files were reviewed and found compliant.

Report Facts
Staff files reviewed: 1

Employees mentioned
NameTitleContext
Julinda RodriguezFacility AdministratorMet with Licensing Program Analysts during the inspection and was granted entry to the facility.
Paola GuerreroLicensing Program AnalystConducted the inspection and signed the report.
Efren MalagonLicensing Program ManagerNamed as Licensing Program Manager on the report.

Inspection Report — Nov 8, 2023

Annual Inspection
Date: Nov 8, 2023

Visit Reason
The visit was an unannounced required comprehensive annual inspection of the Residential Care Facility for Elderly (RCFE).

Findings
The facility was found to be operating within approved capacity and in good repair with no obstructions, adequate safety measures, and sufficient staffing. No deficiencies were cited during the inspection.

Report Facts
Residents present: 2 Staff present: 1 Water temperature: 108

Employees mentioned
NameTitleContext
Julinda RodriguezFacility AdministratorMet with Licensing Program Analyst during inspection and participated in exit interview
Paola GuerreroLicensing Program AnalystConducted the unannounced annual inspection
Efren MalagonLicensing Program ManagerNamed in report as Licensing Program Manager

Inspection Report — Nov 8, 2022

Annual Inspection
Date: Nov 8, 2022

Visit Reason
The visit was an unannounced required annual inspection with an emphasis on infection control due to the COVID-19 pandemic.

Findings
The facility has an adequate COVID-19 infection control plan and supplies, but a deficiency was issued due to items blocking the water heater posing a potential health and safety risk. The facility also has two additional rooms added with permits, and follow-up with the fire department is planned to ensure updated fire clearance.

Citations (1)
The licensee failed to keep walkways from the garage clear which poses a potential health, safety or personal rights risk to persons in care.
Report Facts
Deficiencies cited: 1 Plan of Correction Due Date: POC due date is 2022-11-22

Employees mentioned
NameTitleContext
Julinda RodriguezFacility AdministratorMet with Licensing Program Analyst and Manager during inspection.
Paola GuerreroLicensing Program AnalystConducted inspection and signed report.
Efren MalagonLicense Program ManagerConducted inspection and signed report.
Sherly MandagiFacility administrator who toured the facility with LPA.

Inspection Report — Nov 3, 2021

Annual Inspection
Date: Nov 3, 2021

Visit Reason
Licensing Program Analyst Melody Brown made an unannounced visit to conduct an annual inspection with emphasis on infection control.

Findings
The facility was observed to have proper infection control measures including screening areas, signage, hand hygiene supplies, PPE, and trained staff. No deficiencies were cited during the inspection.

Employees mentioned
NameTitleContext
Julinda RodriguezAdministratorGreeted Licensing Program Analyst and accompanied on facility tour.
Melody BrownLicensing Program AnalystConducted the annual inspection visit.
Efren MalagonLicensing Program ManagerNamed in report header.

Viewing

Loading inspection reports...