Inspection Reports for
A Kind Heart Senior Care
10541 Debra Ave, Granada Hills, CA 91344, United States, CA, 91344
Back to Facility Profile3 Reports
Inspection Report — Mar 4, 2026
Annual Inspection State
Date: Mar 4, 2026
Visit Reason
Licensing Program Analyst Michael Cava conducted an Annual Required visit and inspection of the facility to evaluate compliance with licensing requirements.
Findings
The facility was found to be in compliance with all applicable regulations with no deficiencies observed during the visit. The physical plant, kitchen, bedrooms, bathrooms, common areas, surrounding grounds, garage, laundry, office, resident and staff files, and medication storage were all inspected and found satisfactory.
Report Facts
Fire extinguisher purchase/charge date: Jan 15, 2026
Hot water temperature: 111
Hot water temperature: 112
Number of bedrooms: 5
Number of bathrooms: 2
Number of half bathrooms: 1
Swimming pool fence height: 5
Swimming pool wall height: 10
Employees mentioned
| Name | Title | Context |
|---|---|---|
| Michael Cava | Licensing Program Analyst | Conducted the annual required visit and inspection |
| Kriseyda Sanchez | Administrator | Facility administrator met with Licensing Program Analyst during inspection |
| Joannie De Vera | Staff member met with Licensing Program Analyst during inspection | |
| Mary G Flores | Licensing Program Manager | Named as Licensing Program Manager on report |
Inspection Report — Mar 12, 2025
Original Licensing State
Date: Mar 12, 2025
Visit Reason
A Pre-Licensing Inspection was conducted following a Change in Owner Application to operate a Residential Care Facility for the Elderly (RCFE). The inspection was to evaluate the facility's readiness for licensure and compliance with regulations.
Findings
The facility's physical environment was found compliant and ready for licensure. The inspection noted adequate supplies, proper safety features including fire clearance, functional auditory alerts, and secured medication storage. The facility accommodates six residents with appropriate bedrooms, bathrooms, common areas, and safety measures.
Report Facts
Inspection start time: 835
Inspection end time: 1130
Hot water temperature: 108
Hot water temperature: 110
Fire clearance date: Dec 17, 2024
Maximum residents accommodated: 6
Number of bedrooms: 5
Number of recliners: 5
Swimming pool fence height: 5
Swimming pool wall height: 10
Employees mentioned
| Name | Title | Context |
|---|---|---|
| Michael Cava | Licensing Program Analyst | Conducted the Pre-Licensing Inspection |
| Kriseyda Sanchez | Administrator/Director | Facility administrator present during inspection |
| Hernan Sanchez | Applicant representative present during inspection | |
| Eva Miller | Supervisor | Supervisor overseeing the licensing evaluation |
Inspection Report — Feb 14, 2025
Original Licensing State
Date: Feb 14, 2025
Visit Reason
The visit was conducted as a Component II completion for a Change in Ownership (CHOW) application for a Residential Care Facility for the Elderly (RCFE).
Findings
The Component II completion was successful. The applicants and administrator demonstrated understanding of licensing laws, facility operation, admission policies, staffing requirements, restrictive health conditions, general provisions, emergency preparedness, complaints and reporting, and pre-licensing readiness.
Employees mentioned
| Name | Title | Context |
|---|---|---|
| Kriseyda Sanchez | Administrator/Applicant | Participant in Component II completion and interview. |
| Hernan Sanchez | Applicant | Participant in Component II completion and interview. |
| Darla Neeley | Supervisor | Supervisor overseeing the licensing evaluation. |
| Celia Phomphachanh | Licensing Evaluator | Licensing evaluator conducting the inspection. |
Viewing
Loading inspection reports...



