Inspection Reports for
Ida Culver House Ravenna

2315 NE 65th St, Seattle, WA 98115, United States, WA, 98115

Back to Facility Profile

6 Reports

2023–2026

Inspection Report — Feb 19, 2026

Annual Inspection
Date: Feb 19, 2026

Visit Reason
The Department of Social and Health Services conducted a full inspection of the Assisted Living Facility on 02/19/2026 to determine compliance.

Findings
The inspection found no deficiencies in the facility.

Inspection Report — Feb 3, 2026

Life Safety
Date: Feb 3, 2026

Visit Reason
The Office of the State Fire Marshal conducted a scheduled fire safety inspection at the residential care facility.

Findings
Several fire safety deficiencies were identified, including lack of documentation for required inspections and maintenance, and a kitchen fire door that did not latch properly. Many deficiencies were corrected on site, but the overall approval status is Disapproved due to outstanding issues.

Deficiencies (19)
IFC 603.2.2. (2021) - Open junction boxes and open-wiring splices are prohibited. Approved covers must be provided for all switch and electrical outlet boxes.
IFC 603.6 (2021) - Extension cords shall not substitute permanent wiring and must be listed and labeled per UL 817. They must not be affixed to structures or used outdoors if marked for indoor use only.
IFC 606.3.3.1 (2021) - Hoods, grease-removal devices, fans, ducts and other appurtenances must be inspected at specified intervals by qualified individuals.
IFC 701.6 (2021) - The owner must maintain an inventory of required fire-resistance-rated construction and inspect and repair it annually.
IFC 705.2 (2021) - Opening protectives in fire-resistance-rated assemblies must be inspected and maintained per NFPA 80, 105, and not be blocked or modified.
IFC 705.2.4 (2021) - Swinging fire doors must close from the full-open position and latch automatically.
IFC 706.1 (2018) - Dampers protecting ducts and air transfer openings must be inspected and maintained per NFPA 80 and 105, and damaged materials repaired or replaced.
IFC 903.5 (2021) - Sprinkler systems must be tested and maintained per Section 901.
IFC 904.13.5.2 (2021) - Automatic fire-extinguishing systems must be serviced at least every six months and after activation, with inspection certificates forwarded to the fire code official.
IFC 906.2 (2021) - Portable fire extinguishers must be selected, installed, and maintained per NFPA 10.
IFC 906.9.1 (2021) - Portable fire extinguishers weighing 40 pounds or less must be installed so their tops are not more than 5 feet above the floor.
IFC 906.9.2 (2021) - Portable fire extinguishers weighing more than 40 pounds must be installed so their tops are not more than 3.5 feet above the floor.
IFC 907.8 (2021) - Smoke detector sensitivity must be checked annually and calibration tests performed as required.
IFC 915.6 (2021) WAC - Carbon monoxide alarms and detectors must be maintained and replaced if inoperable or at end-of-life.
IFC 907.8.3 (2021) - Smoke detectors must be tested and maintained, including monthly tests for single and nuisance alarms.
IFC 907.8.3 (2021) - Smoke detector sensitivity must be checked within one year after installation and every alternate year thereafter.
IFC 1032.10.1 (2021) - Emergency lighting equipment must be tested monthly for at least 30 seconds and inspected for trouble indicators.
IFC 1031.10.2 (2021) - Battery-powered emergency lighting must be tested annually for at least 90 minutes.
IFC 1032.2 (2021) - Required exits and exit discharges must be continuously maintained free from obstructions and not used for other purposes.
Report Facts
Next inspection scheduled: Mar 5, 2026

Notice — Sep 9, 2024

Date: Sep 9, 2024

Visit Reason
This document communicates the outcome of the Informal Dispute Resolution process for disputed deficiencies identified in the Statement of Deficiencies report dated July 29, 2024.

Findings
After review, no changes were made to the original Statement of Deficiencies report. The facility is instructed to begin correcting the disputed deficiencies immediately and submit a Plan/Attestation Statement within 10 calendar days.

Report Facts
Correction timeframe: 45 IDR letter date: Sep 9, 2024 Original SOD report date: Jul 29, 2024

Inspection Report — Aug 27, 2024

Follow-Up
Date: Aug 27, 2024

Visit Reason
The Department of Social and Health Services conducted a follow-up inspection of the Assisted Living Facility to verify correction of previously cited deficiencies.

Findings
The follow-up inspection found no deficiencies and confirmed that the facility meets Assisted Living Facility licensing requirements. Previously cited deficiencies were corrected as documented.

Deficiencies (3)
WAC 388-78A-2474 Training and home care aide certification requirements. The facility failed to ensure 1 of 5 sampled staff completed in-person First Aid training, placing residents at risk of harm from untrained staff.
WAC 388-78A-2485 Tuberculosis Positive test result. The facility failed to ensure 1 staff with positive TB test results received a chest x-ray within seven days, placing residents at risk of exposure to a contagious disease.
WAC 388-78A-2860 Relocation of residents during construction. The facility failed to notify the Department at least thirty days prior to the anticipated move date of residents, resulting in the Department being unaware that 9 of 9 residents had been moved out and placed at risk of harm.
Report Facts
Sampled staff: 5 Residents relocated: 9

Notice — Aug 12, 2024

Date: Aug 12, 2024

Visit Reason
The letter confirms the scheduling of an Informal Dispute Resolution meeting requested by the facility to dispute a Statement of Deficiencies dated July 29, 2024.

Findings
The document does not contain inspection findings but addresses the dispute process for a cited deficiency under WAC 388-78A-2860.

Inspection Report — Nov 27, 2023

Life Safety
Date: Nov 27, 2023

Visit Reason
The Office of the State Fire Marshal conducted a scheduled fire safety inspection at the facility on 11/27/2023.

Findings
All violations noted during previous related inspections have been corrected. The facility was approved following this inspection.

Viewing

Loading inspection reports...