Inspection Reports for
Parkwood Meadows Senior Living

MO, 63670

Back to Facility Profile

2 Reports

2022–2025

Inspection Report — Nov 6, 2025

Routine
Date: Nov 6, 2025

Visit Reason
Missouri state licensure survey (State Form); the survey type is not stated.

Findings
One Missouri state licensure deficiency was cited for failure to follow required tuberculosis screening procedures for employees, specifically not ensuring two-step tuberculin skin tests were read per regulatory guidelines, which had the potential to affect all residents.

Deficiencies (1)
19 CSR 30-86.047(19) TB Screen Residents & Staff: Based on interview and record review, the facility failed to follow appropriate infection prevention practices for nine out of ten employee tuberculosis screenings by not ensuring two-step tuberculin skin tests were read per regulatory guidelines. This had the potential to affect all residents.
Report Facts

Inspection Report — May 10, 2022

Routine
Date: May 10, 2022

Visit Reason
Missouri state licensure survey (State Form); the survey type is not stated.

Findings
2 state deficiencies were cited addressing hot water temperatures above the required range and failure to properly remove/destroy expired medications found in medication storage and overflow cabinets.

Deficiencies (2)
19 CSR 30-86.032(34) Hot Water 105-120 Degrees F: Plumbing fixtures accessible to residents had water temperatures above the required 105-120 degrees F range; observations and record review found fixture and water heater readings exceeding 120 degrees Fahrenheit.
19 CSR 30-86.047(56)(E)(1-2) Medications-Return to RX / Destroy, Records: Expired medications were not destroyed within the required timeframe and multiple expired items were found in overflow cabinets and resident medication areas.
Report Facts
residents affected: 4

Viewing

Loading inspection reports...