Inspection Reports for
Pomeroy Living Northville Assisted & Memory Care

40033 W. Eight Mile, Northville, MI, 48167

Back to Facility Profile

5 Reports

2016–2024

Inspection Report — Sep 12, 2024

Complaint Investigation
Date: Sep 12, 2024

Visit Reason
Investigation of a complaint received on 2024-09-10 about inadequate supervision of Resident A and billing issues.

Complaint Details
Inadequate supervision of Resident A: established. Resident A was not charged according to his contract: not established. Additional findings: not established.
Findings
One violation was established related to inadequate supervision of Resident A resulting in multiple falls. The allegation that Resident A was not charged according to his contract was not established.

Deficiencies (1)
R 325.1921 Governing bodies, administrators, and supervisors: the facility failed to provide adequate supervision for Resident A, who had four falls due to poor safety awareness and inability to provide one-on-one care. The use of a tilt back wheelchair seat was considered a form of restraint and not an appropriate supervision method.
Report Facts
Corrective action plan due: 15

Inspection Report — Sep 13, 2023

Renewal
Date: Sep 13, 2023

Visit Reason
Renewal inspection of the adult foster care family home license.

Findings
The home was found in non-compliance with 3 rules; a written corrective action plan was required before the license is renewed.

Deficiencies (3)
R 325.1922 Admission and retention of residents: Resident A’s chest x-ray was completed after her move in and not prior to admission as outlined in this rule.
R 325.1932 Resident medications: Resident B missed one or more scheduled doses of Tramadol on 8/18/23, 8/30/23 and 8/31/23 with no documented reason, and Resident C did not receive a shampoo application from 9/2/23-9/6/23 as prescribed.
R 325.1953 Menus: The menu posted in the assisted living dining room was not updated to reflect the current week and instead listed meals for the week of 9/3/23-9/9/23.
Report Facts
Corrective action plan due: 15

Inspection Report — May 5, 2022

Date: May 5, 2022

Visit Reason
To identify changes in licensed bed designation from the general assisted living population into memory care beds.

Findings
Resident rooms in the 200-hall “Copper Harbor” neighborhood will be designated solely as memory care beds. The licensed bed capacity and the status of the license will remain unchanged.

Inspection Report — Feb 14, 2019

Date: Feb 14, 2019

Visit Reason
The licensee is in process of changing facility name from Beacon Square Northville to Pomeroy Living Northville Assisted & Memory Care.

Findings
The facility name will be changed from Beacon Square Northville to Pomeroy Living Northville Assisted & Memory Care. The status of the license will remain unchanged.

Inspection Report — Mar 21, 2016

Original Licensing
Date: Mar 21, 2016

Visit Reason
Original license application for a home for the aged.

Findings
The facility was found to be in substantial compliance with applicable licensing statutes and administrative rules.

Report Facts
License length: 6

Viewing

Loading inspection reports...